Reference
Reference list of the Centre for Surface Mining and Ecology:
No. |
INVESTOR |
COMODITY |
1. |
R i TE Gacko, |
Study of coal exploitation reserves in coal basin Gacko, (1999.) |
2 |
R i TE Gacko, |
Layouts for creating the additional mining project of open pit mine Gracanica-Gacko (Exploitation reserves study, vectorisation of situation plans, database), (1999.) |
3. |
R i TE Gacko, |
Study at open pit mine Gracanica-Gacko, Exploitation reserves, N8, Exploitation costs, (1999.) |
4. |
R i TE Gacko, |
Primary conception of coal exploitation on open pit mine Gracanica-Gacko, (Digitalisation of survey layouts and computer processing of geological data base), (1999.) |
5. |
Fabrika cementa Kosjerić d.o.o., |
Expertise of limestone and sandstone exploitation balances at open pit mines Galovici and Suva Vrela for the cement factory in Kosjeric, (1999.) |
6. |
R i TE Gacko, |
Elaboration of physical-mechanical rock properties on open pit mine Gracanica-Gacko, (1999.) |
7. |
JP RB Kolubara, Lazarevac |
Additional mining project of ash and slag disposal form TEP Kolubara B into open pit mine West field, (1999 - 2000) |
8. |
Površinski kop Kijevo, Beograd |
Survey of limestone open pit mine Kijevo - Belgrade, (2000.) |
9. |
Fabrika cementa Kosjerić d.o.o., |
Reserves study of potential deposits of eruptive rock and gravel in northern Serbia, (2000.) |
10. |
R i TE Gacko, |
Feasibility study of exploitation system reconstruction on open pit mine Gracanica-Gacko, (2000.) |
11. |
Rudnici i industrija mermera i granita Venčac, |
Pre-investment study for development of marble open pit mine Vencac, (2000.) |
12. |
Fabrika cementa Beočin d.o.o., |
Conception of living environment pollutant catastre of cement factory Beocin, (2001.) |
13. |
R i TE Gacko, |
Long term development program of open pit mine Gracanica-Gacko to the end of exploitation, (2001.) |
14. |
AD Bijeljina - Put, Bijeljina |
Additional mining project of gravel separation Popovi Bijeljina, (2002.) |
15. |
R i TE Gacko, |
Development program of coal exploitation in basin Gacko up to year 2020, (2002.) |
16. |
R i TE Ugljevik, Ugljevik |
Feasibility study of east contour enlargement on open pit mine Bogutovo Selo for annual production of 500000 tones of coal, (2002.) |
17. |
R i TE Ugljevik, Ugljevik |
|
18. |
Rudnik nemetala Valjevo, |
Technical-economic study of the Bogovadja deposits - Valjevo, (2003.) |
19. |
AD Putevi Ivanjica, |
Technical-economic study of the Rascici deposits - Ivanjica, (2003.) |
20. |
R i TE Ugljevik, Ugljevik |
Additional mining project of open pit mine Bogutovo Selo in Ugljevik - Primary conception, (2003.) |
21 |
R i TE Ugljevik, Ugljevik |
|
22. |
R i TE Ugljevik, Ugljevik |
Additional mining project of open pit mine Bogutovo Selo in Ugljevik - Technical project of dewatering, (2003.) |
23. |
Borovica |
Project of diabase exploitation on open pit mine Tavani, (2004.) |
24. |
Kopovi - ub, |
Major mining project of ceramics clay, open pit mine Boj Brdo - Primary conception, (2004.) |
25. |
Kopovi - ub, |
Major mining project of ceramics clay, open pit mine Boj Brdo - Technical project of exploitation, (2004.) |
26. |
R i TE Gacko, Gacko |
Additional mining project of open pit mine Gracanica-Gacko until the end of exploitation - Project of open pit mine closing - General part, (2005.) |
27. |
R i TE Gacko, |
Additional mining project of open pit mine Gracanica-Gacko until the end of exploitation - Project of open pit mine closing - Technical project of exploitation, (2005.) |
28. |
R i TE Gacko, |
Additional mining project of open pit mine Gracanica-Gacko until the end of exploitation - Project of open pit mine closing - Technical project of dewatering, (2005.) |
29. |
R i TE Gacko, |
Additional mining project of open pit mine Gracanica-Gacko until the end of exploitation - Project of open pit mine closing - Technical project of dewatering - mechanical part, (2005.) |
30. |
R i TE Gacko, |
Additional mining project of open pit mine Gracanica-Gacko until the end of exploitation - Project of open pit mine closing - Technical project of electrical power supply, (2005.) |
31. |
R i TE Gacko, |
Additional mining project of open pit mine Gracanica-Gacko until the end of exploitation - Project of open pit mine closing - Technical project of dewatering - electrical part, (2005.) |
32. |
R i TE Gacko, |
Additional mining project of open pit mine Gracanica-Gacko until the end of exploitation - Project of open pit mine closing - Technical project of crusher - electrical part, (2005.) |
33. |
R i TE Gacko, |
Additional mining project of open pit mine Gracanica-Gacko until the end of exploitation - Project of open pit mine closing - Technical project of reclamation and protection of living environment, (2005.) |
34. |
R i TE Gacko, |
Additional mining project of open pit mine Gracanica-Gacko until the end of exploitation - Project of open pit mine closing - Technical - economic estimate of open pit mine work, (2005.) |
35. |
R i TE Ugljevik a.d., |
Additional mining project of open pit mine Bogutovo Selo - Ugljevik - Technical project of ash and slag disposal from TPP Ugljevik to the Great West waste disposal of the open pit mine Bogutovo Selo - Ugljevik, (period 2005-2009), (2005.) |
36. |
R i TE Ugljevik a.d., |
Technical-economic analysis of the coal primary crushing on open pit mine Bogutovo Selo - Ugljevik, (2003.) |
37. |
R i TE Ugljevik a.d., |
Expertise of existing state on the open pit mine Bogutovo Selo - Ugljevik,(2005.) |
38. |
Rudnik nemetala Valjevo, |
Major mining project of quartz sand and gravel on open pit mine Bogovadja - Primary conception,(2005.) |
39. |
Rudnik nemetala Valjevo, |
Major mining project of quartz sand and gravel on open pit mine Bogovadja - Technical project of exploitation,(2005.) |
40. |
Niko Cink Komerc, Barajevo |
Simplified mining project of drilling and blasting at locality Paumbara - Vencac near Arandjelovac,(2005.) |
41 |
Borovica |
Major mining project of exploitation on open pit mine Tavani - Primary conception,(2006.) |
42 |
Borovica |
Major mining project of exploitation on open pit mine Tavani - Technical project of exploitation,(2006.) |
43 |
Borovica |
Main mining project of exploitation on open pit mine Tavani - Technical project of technical and environmental protection,(2006.) |
44 |
Granitpeščar Ljig, |
Additional mining project of carbonate open pit mine Rujevac - Ba, (2006.) |
45. |
Putevi Čačak, |
Additional mining project of carbonate open pit mine Susica, (2006.) |
46. |
Srki d.o.o., |
Simplified mining project of exploitation on open pit mine Krs, (2006.) |
47. |
Srki d.o.o., |
Feasibility study of open pit mine Krs - Veliki Senj, (2006.) |
48. |
Srki d.o.o., |
Project of reclamation on open pit mine Krs - Veliki Senj, (2006.) |
49. |
Borverk d.o.o., Lajkovac |
|
50. |
Borverk d.o.o., |
|
51. |
Borverk d.o.o., |
|
52. |
SO Ljig, |
|
53. |
Autokop d.o.o., |
|
54. |
Autokop d.o.o., |
Investment program of construction of carbonate open pit mine Kamenjak - Vrhovine near Ub,(2006.) |
55. |
Consortium of investors |
Reclamation project of parcels on which is done exploitation of carbonate in village Struganik,(2006.) |
56. |
Zorka alas kamen, |
Feasibility study of zeolite tuff and tuff with zeolite in the deposit Opciste near Beocin,(2007.) |
57. |
EFT Group |
Study: Estimation of open pit mines exploitational coal reserves for long-term supply of power plant Stanari,(2007.) |
58. |
Borverk d.o.o. |
Major mining project of carbonate open pit mine Jerinin Grad - Slovac,(2007.) |
59. |
Put d.o.o., |
Technical control of the additional mining project of dolomite marble exploitation on open pit mine Josanicki Prnjavor near Jagodina,(2007.) |
60. |
Ostrvica a.d., |
Technical control of major mining project work dismissal on carbonate open pit mine Mezulana on the mountain Rudnik - Gornji Milanovac,(2008.) |
61. |
Toza Marković a.d., |
Technical control of additional mining project of exploitation of ceramics clays at deposit Glinokop, East rewire near Kikinda,(2008.) |
62. |
Mineral |
Feasibility study of lignite exploitation on open pit mine Cukara,(2008.) |
63. |
Mineral Kop d.o.o., |
|
64. |
EpRS, R i Te Gacko |
Necessary departure from Additional mining project of open pit mine Gracanica Gacko and Major project of ash waste on TEP Gacko on the inner waste dump PK Gracanica - ash dump - cartridge no. 2,(2008.) |
65. |
PZP Požarevac, |
Technical control of Major mining project of carbonate open pit mine in Kaona near Kucevo,(2008.) |
66. |
Venčac a.d., |
Technical control of Additional mining project of construction stone exploitation on the deposits Zabrezje - Vencac, with development of mine by the depth below K-388 to K-340,(2008.) |
67. |
ZP RITE Ugljevik a.d., |
Additional mining project of combined coal transportation and primary crusher reconstruction on open pit mine Bogutovo Selo,(2008.) |
68. |
Pro Voding d.o.o. |
Applicability analysis of company Ameron international pipes for dewatering well constructions on lignite open pit mines,(2009.) |
69. |
Mineral |
Feasibility study of lignite exploitation on open pit mine Cukara - South Field,(2009.) |
70. |
Mineral |
Project of reclamation on open pit mine Cukara - South Field,(2009.) |
71. |
EFT Group R i TE Stanari, Stanari |
Business process engineering and manufacturing process model coal mine Stanari,(2009.) |
72. |
University of Belgrade, Mining and Geology faculty, Belgrade |
Preliminary design with feasibility study of construction of open pit Field E - Update Study - Techno-economic and financial analysis,(2009.) |
73. |
University of Belgrade, Mining and Geology faculty, Belgrade |
Software for selective mining by cotinual mining systems,(2009.) |
74. |
EFT Group R i TE Stanari, Stanari |
Technical control of Additional mining project of open pit Raskovac,(2009) |
75. |
R i TE Gacko, Gacko |
Additional mining project of open pit mine Gracanica in part of Field C - General part,2010) |
76. |
R i TE Gacko, Gacko |
Additional mining project of open pit mine Gracanica in part of Field C - technical project of exploitation,(2010.) |
77. |
R i TE Gacko, Gacko |
Additional mining project of open pit mine Gracanica in part of Field C - Technical project of dewatering,(2010.) |
78. |
R i TE Gacko, Gacko |
Additional mining project of open pit mine Gracanica in part of Field C - Technical project - electrical part,(2010.) |
79. |
R i TE Gacko, Gacko |
Additional mining project of open pit mine Gracanica in part of Field C - technical project - mechanical part,(2010.) |
80. |
R i TE Gacko, Gacko |
Additional mining project of open pit mine Gracanica in part of Field C - Technical project of reclamation and protection of living environment,(2010.) |
81. |
R i TE Gacko, Gacko |
Additional mining project of open pit mine Gracanica in part of Field C - Technical - economic estimate of open pit mine work,(2010.) |
82. |
R i TE Gacko, Gacko |
Techno-economic analysis of level of revitalization of continuous BTO system open pit Gračanica,(2011.) |
83. |
R i TE Gacko, Gacko |
Tender documents for the procurement of goods and services for revitalisation of mechanical and electrical equipment for continuous systems,(2011.) |
84. |
R i TE Gacko, Gacko |
Tender documents for the procurement of conveyors B = 1400 mm (2011.) |
85. |
R i TE Ugljevik Ugljevik |
Additional mining project of open pit mine Bogutovo Selo Ugljevik - open pit mine closing, Parts: Dewatering and protection of open pit and waste dump of groundwater and surface water, Reclamation and Economical part of the project,(2011.) |
86. |
EFT Group R i TE Stanari Stanari |
Technical control of Additional mining project of open pit Raskovac - Necessary changes to the excavation of overburden on OPM Raškovac,(2011) |
87. |
EFT Group R i TE Stanari Stanari |
Technical control of Additional mining project of open pit Raskovac - Necessary changes to the excavation of coal in north final slope on OPM Raškovac,(2011) |
88. |
EFT Group R i TE Stanari Stanari |
Technical control of Additional mining project of open pit Raskovac - Technical project of building for storage of solid tape residue from combustion power plant in the OPM Raškovac, mine part Dragalovci EFT - mine and power plant Stanari Ltd, Stanari,(2011.) |
89. |
R i TE Gacko Gacko |
Technical control of conceptual and technical mining project of the complex structures on the mine complex on OPM Gacko-Field C within the Additional mining project of exploitation of part Field C, OPM Gacko, Gacko,(2012.) |
90. |
University of Belgrade, Mining and Geology Faculty, Belgrade |
Techno-economic feasibility of suspension of works on PK Klenovnik,(2012.) |
91. |
University of Belgrade, Mining and Geology Faculty, Belgrade |
Assessing the potential and limitations of reclamation of OPM Klenovnik with the interpretation of effects of measures on environmental reclamation,(2012.) |
92. |
R i TE Gacko Gacko |
Necessary departure from Additional mining project of open pit mine Gracanica in part of Field C, (2012.) |
93. |
Dargo Associates ltd |
Pre-feasibility study of deposit of lignite in the BVI, Sindh, Pakistan,(2012) |
94. |
Dargo Associates ltd |
Technical control of feasibility study for the deposit of lignite in the BVI, Sindh, Pakistan,(2012) |
95. |
Titan cementara Kosjerić, Kosjerić |
Detailed geological explorations of gravel and sand, making the elaborate on reserves and certification of reserves at the site Žarkovac near Kovin,(2012) |
96. |
ECO TRADE, Priština |
Defects inspection and removal of defects in tightening on a conveyor rubber bands with width of 1800 mm on a continuous system of Kosovo Energy Corporation J.S.C.,(2013) |
97. |
Institut za arhitekturu i urbanizam Srbije, Belgrade |
Study basis for the concept of sustainable spatial development of the Bor-Majdanpek mining basin,(2013) |
98. |
R i TE Ugljevik, Ugljevik |
Feasibility Study for the grant of concessions for the use of coal deposits Bogutovo village and Ugljevik East 1,(2013) |
99. |
R i TE Ugljevik, Ugljevik |
Study of alternative solutions for opening and exploitation of coal in the ope pit Ugljevik East 1,(2014) |
100. |
R i TE Gacko, Gacko |
Additional mining project of the final contour sanation, coal exploitation from the final contour and overburden disposal in a inside dump of the open pit Gracanica-Gacko,(2014) |
101. |
University of Belgrade, Mining and Geology faculty, Belgrade |
Preparation of layers and tender documentation for coal quality management in the open pit Drmno,(2014) |
102. |
Montprojekt, Belgrade |
Technical control of the Technical Mining project of the power supply for new ETS system on the open pit field C, (2014) |
103. |
University of Belgrade, Faculty of Technology and Metallurgy, Belgrade |
Study to consolidate ash dumps in order to have functional works on the ash pan, (2015.) |
104. |
Teko Mining Rakovac a.d Ledinci |
Technical control of the Main mining project for the permanent suspension of work at the tarchyte open pit Kišnjeva glava on Fruska Gora, (2015.) |
105. |
R i TE Ugljevik, Ugljevik |
Development of the Main mining project, technical projects for PK Ugljevik Istok 1, (2015.) |
106. |
Institut za arhitekturu i urbanizam Srbije, Belgrade |
Study of the basics of sustainable spatial development of Kolubara basin, (2015.) |
107. |
Elektroprivreda Srbije, Belgrade |
The long-term program of coal exploitation in coal-bearing basins EPS, (2016.) |
108. |
JP EPS Ogranak RB Kolubara, Lazarevac |
The Main mining project of open pit Radljevo-technical project of the defense of the mine from ground water, (2016.) |
109. |
JP EPS Ogranak RB Kolubara, Lazarevac |
The Main mining project of open pit Radljevo-technical project of the defense of the mine from surface water, (2016.) |
110. |
AD ELEM, Skoplje |
Strategy of long term supply for REK Bitola with coal for period of 2016-2046, (2017.) |